Minutes:
Listed building consent 16/00798/LBC
Resolved: That the application be permitted subject to the undermentioned conditions:
(i) Time limit for commencement of development
(ii) Approved plans
(iii) Demolition works not to proceed until planning permission
granted for redevelopment and a contract let for that development
(iv) Details and materials for the making good of the main
building following the demolition of extensions
(v) Method statement for repair and consolidation of
stonework
(vi) Further details of internal doors and window architraves
where alterations are being made
(vii) Details of repair work to existing windows and details
including samples of proposed new windows
(viii) Details of any secondary glazing systems
(ix) Details of suspended ceilings system
(x) Details of the mezzanine floor
(xi) Details of the treatment of internal corridors and internal
windows/fanlights
(xii) Details of drainage requirements to service the en-suites
(xiii) Details of all other proposed external materials
(xiv) Any repointing to be in lime mortar
Planning application 16/00796/OUT
Resolved: (A) That, subject to the applicant (providing they first agree in
writing, by noon on 28th April to extend the statutory determination period to the 9th June 2017) entering into a Section 106 obligation by agreement by 6th June 2017 to secure a review mechanism of the scheme’s ability to make a policy compliant contributions to public open space, travel plan monitoring and on street parking controls, if the development is not substantially commenced within 12 months from the date of the decision, and the payment of such a contributions if found financially viable, the application be permitted subject to the undermentioned conditions:
(i) Standard time limits for submission of application for
approval of reserved matters and commencement of development
(ii) Reserved matters submission
(iii) Approved plans
(iv) Occupation to be restricted to students only
(v) Residential parking survey of streets to be agreed prior to
first occupation of the development and a second survey
12 months later when fully occupied
(vi) Provision of access
(vii) Off-site highway works
(viii) Details of surfacing materials, surface water drainage and
delineation of parking bays
(ix) Closure of existing access
(x) Car park access to remain ungated
(xi) Provision of secure weatherproof cycle parking
(xii) Travel plan
(xiii) Construction method statement
(xiv) Landscaping and tree protection conditions
(xv) Contamination conditions with respect to controlled
waters
(xvi) Building recording
(xvii) Written scheme of archaeological investigation
(xviii) Construction and demolition hours
(xix) Piling
(xx) Dust mitigation
(xxi) Dwelling noise levels
(xxii) External materials
(xxiii) Drainage conditions
(xxiv) Implementation of security/crime prevention measures
(xxv) Building wide ventilation system for Main Building
(xxvi) Heating system of both Main and New buildings
(xxvii) Phasing requirement
(xxviii)Revised parking layout
(xxix) Provision of 19 car parking spaces
(B) Failing completion by the date referred to in the above resolution B(1) of the above planning obligation, that the Head of Planning be given delegated authority to either refuse the planning application on the grounds that in the absence of a secured planning obligation the public open space needs of the development would not be met and the development would fail to ensure it achieves sustainable development outcomes; or if he considers it appropriate, to extend the period of time within which the obligation can be secured.
Supporting documents: